Tejas Hydraulics
We do not sell or ship outside of the United States.
Estimated Lead Time: 30 working days
$2,858.74
PowerShift
6-Bolt
12V Elec/Air
Direct Mount
SAE B (7/8" – 13T)
Rot. 2/4-Bolt B (30°)
PTO