Tejas Hydraulics
We do not sell or ship outside of the United States.
Estimated Lead Time: 20 working days
$1,838.53
Mechanical
6-Bolt
12V Elec/Air (Eaton Procision)
Direct Mount
SAE B (7/8" – 13T)
SAE B 2/4-Bolt (rot 90°)
PTO