Tejas Hydraulics
We do not sell or ship outside of the United States.
Estimated Lead Time: 20 working days
$1,940.70
Mechanical
6-Bolt
12V Elec/Air (Eaton Procision)
Direct Mount
SAE BB (1" – 15T)
Rot. 4-Bolt B (30°)
PTO