Tejas Hydraulics
We do not sell or ship outside of the United States.
Estimated Lead Time: 20 working days
$2,470.50
Mechanical
8-Bolt
D.A. Air, Endurant XD w/o Inst
Direct Mount
SAE B (7/8" – 13T)
Rot. 2/4-Bolt B (60°)
PTO