We do not sell or ship outside of the United States.
49-100-R3-100
LENZ
MPN: 49-100-R3-100
Estimated Lead Time: 15 working days
Stock Status: Normally In Stock$111.64
| Weight | - lbs |
|---|---|
| Series | |
| Type | |
| Bypass | |
| Max Flow (gpm) | |
| Max Pressure (psi) |
Strainer, 100 GPM, 3”, 100 Mesh.. 48FP, with bypass
