Tejas Hydraulics
We do not sell or ship outside of the United States.
Estimated Lead Time: 10 working days
$162.04
PEM-G
Cast Aluminum
SAE A, 2 Bolt
P/E Adapter PEM-G x A-2 M=5.62”