We do not sell or ship outside of the United States.
680GQAHX-V3RF
Parker CPD Chelsea
MPN: 680GQAHX-V3RF
Estimated Lead Time: 20 working days
Stock Status: Factory Order$1,920.78
| Weight | 33 lbs |
|---|---|
| PTO Type | |
| Mount | |
| Shift Type | |
| Output Type | |
| Output Shaft | |
| Output Flange |
Mechanical 8-Bolt PTO, Rot. 2-B Mnt, 1”-15T, Air Shift w/o Install Kit